Decision Letter
103692.pdf · PDF · 192.8 KB · 4 pages
AI overviewWhat this document contains
This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter and contains a decision letter approving a $4,392,251 capital expenditure for the refurbishment of Lingan Unit 2 to meet winter capacity needs through 2025 into winter 2026. It covers the approval of the project, the rationale for maintaining LIN2 in cold reserve, the approval of related operating costs, and details on the expenditure profile and filing types related to capital project authorizations.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12959 — Nova Scotia Power Inc. - CI C0082195 – LIN2 2025/26 Capacity Requirement - $4,392,251
Filing event: DECISION on 09/24/2026 · View digest →