Home2025 Ace PlanM12373Evidence
Topic/Matter Intersection

Topic:"2025 Ace Plan" in M12373

Matter: Nova Scotia Power Inc. - CI C0067908 – POA Boiler Refractory Refurbishment 2025 – $1,378,466
4 passages 4 documents

2025 Ace Plan across all matters →

N-1Application 1 passage
Reason for Variance p. p. 1
Reason for Variance The increase of approximately $289,000 from the 2025 ACE Plan estimate of $1,089,478 to the revised estimate of $1,378,466 is primarily due to refined material cost estimates obtained through detailed vendor engagement....

AI summary The increase of approximately $289,000 in the 2025 ACE Plan estimate is primarily due to higher material costs, especially for refractory materials, influenced by tariffs and vendor pricing adjustments.

99231Board Decision Letter 1 passage
CI # C0067908 POA Boiler Refractory Refurbishment 2025 $1,378,466 p. pp. 0-2
CI # C0067908 POA Boiler Refractory Refurbishment 2025 $1,378,466 This capital item was included in NS Power's 2025 ACE Plan with a budget of $1,089,478, listed among the projects pending subsequent approval. In its submission, NS Power in...

AI summary NS Power requested approval for a $1.378 million refractory refurbishment project in 2025, citing increased material costs due to tariffs and market conditions. The Board accepted the project's necessity and approved the funding, noting NS Power's alignment with plant retirement plans and the critical role of refractory systems in boiler reliability.

98425Letter NSPI re: Capital Items Filed Outside the Quarter Package 1 passage
2025 ACE Plan Capital Items for Subsequent Approval p. p. 0
2025 ACE Plan Capital Items for Subsequent Approval - CI C0061003 POA LP HP IP Turbine Refurbishment $4,861,261 2025 ACE amount $4,155,131 $9,776 spent as at March 31, 2025 Partially Confidential - CI C0061005 POA Cell Capping 2025 $2,530,...

AI summary The 2025 ACE Plan lists capital items requiring approval, including turbine refurbishment ($4.86M), cell capping ($2.53M), and boiler refurbishments ($1.22M–$1.38M). As of March 31, 2025, spending ranged from $0 to $9,776, with varying confidentiality statuses.

99231Board Decision Letter 1 passage
CI # C0067908 POA Boiler Refractory Refurbishment 2025 $1,378,466 p. pp. 0-2
CI # C0067908 POA Boiler Refractory Refurbishment 2025 $1,378,466 This capital item was included in NS Power's 2025 ACE Plan with a budget of $1,089,478, listed among the projects pending subsequent approval. In its submission, NS Power in...

AI summary NS Power requested $1.378 million for refractory refurbishment in its 2025 ACE Plan, citing increased material costs. The Board approved the request, acknowledging the project's necessity for boiler reliability and justifying the cost increase due to tariffs and market conditions. NS Power emphasized functional differences requiring specialized maintenance and deferred full replacements due to plant retirement plans.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →