Matter: Nova Scotia Power Inc. - CI C0061003 – POA LP HP IP Turbine Refurbishment – $4,861,261
3 passages 2 documents

Energy Efficiency Resource Assessment Model across all matters →

N-2NSPI (NSEB) RIRs 1-14 - Redacted 2 passages
CI C0061003 – POA LP HP IP Turbine Refurbishment (NSEB M12370) NSPI Responses to NSEB Information Requests p. p. 8
CI C0061003 – POA LP HP IP Turbine Refurbishment (NSEB M12370) NSPI Responses to NSEB Information Requests 1 Request IR-11: 27 industry-specific input checklists and maturity matrices. The project team selects the 28 matrix type that most...

AI summary The document discusses NSPI's responses to NSEB information requests regarding turbine refurbishment projects. It outlines the use of AACE International RP 18R-97 for cost estimate classification and notes the absence of industry-specific input checklists and maturity matrices for thermal electrical generation. Vendor pricing and currency conversion practices are also addressed.

CONFIDENTIAL (Attachment Only) p. p. 8
CONFIDENTIAL (Attachment Only) 1 Request IR-14: 2 3 (a) If this project were not to proceed, please identify the net present value of the total 4 replacement cost of energy to replace POA energy for 2026 to 2029, assuming 7555, 5 2592, 126...

AI summary The response to Request IR-14 outlines the net present value of replacing energy from Point Aconi (POA) from 2026 to 2029, highlighting that while there are REC savings in 2026, no savings occur in subsequent years. The justification for the project is based on the 168 MW of firm capacity provided by POA, which is critical for meeting system demand during peak hours.

98595NSEB (NSPI) IR-1 to IR-14 1 passage
Request IR-1:
Request IR-1: - a) What is the current rated capacity (in MW) of the Point Aconi (PA) generating unit? - b) Is the PA unit classified as lower-emitting or higher-emitting? - c) Is the PA unit classified as lower-cost or higher-cost compare...

AI summary The document contains four requests (IR-1 to IR-4) seeking detailed information about the Point Aconi generating unit, including its capacity, emissions, cost, retirement, and replacement plans, as well as its alignment with NS Power's renewable energy targets.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →