N-2NSPI (NSEB) RIR 1 to 2
5 passages
1 Request IR-1: 2 3 Page 1 of the application notes that Nova Scotia Power Incorporated (NS Power) operates a 4 comprehensive preventative maintenance program which includes inspections, condition 5 assessments, and targeted maintenance to...
AI summary The text discusses a request for information regarding the repair of a generator at Hollow Bridge, including the estimated time to complete the repair, past power production, maintenance history, and maintenance frequency. NS Power is mentioned as the entity responsible for the generator's maintenance.
(c) Operational work was carried out on the Hollow Bridge generator between 2020-2025 at an approximate cost of $20,000. This work included slip ring and brush maintenance, troubleshooting issues with the excitation system and breaker oper...
AI summary Operational maintenance work costing approximately $20,000 was conducted on the Hollow Bridge generator from 2020 to 2025, including inspections, testing, and component adjustments. No issues were identified with the generator during this period.
Checklist: CA-GEN-INSUL-TEST Last Inspected By: AG416 Description: Condition Assessment: Generator Insulation Test Last Inspected: 2023-08-24 WO#: 151302 Building# - Eqp#: 06V1-01-01 - HB1 GENERATOR Task Result Comments 1) SYSTEM BLACK RIV...
AI summary This document is a checklist for a generator insulation test conducted on August 24, 2023, at the Black River Station, Generator Unit 1. It includes details such as temperature, humidity, and insulation resistance measurements, as well as test procedures and conditions.
Generated 2025-12-18 - Checklist JP1052-A - Checklist: JP1052-A Last Inspected By: AQ378 Description: GENERATOR STATOR INSULATION TEST Last Inspected: 2024-08-22 WO#: 159044 Building# -
AI summary This document is a checklist for a generator stator insulation test, last inspected on August 22, 2024, with work order number 159044. It is part of a regulatory inspection process.
Checklist: CA-GEN-INSUL-TEST Last Inspected By: AQ378 Description: Condition Assessment: Generator Insulation Test Last Inspected: 2025-07-15 WO#: 168698 Building# - Eqp#: 06V1-01-01 - HB1 GENERATOR Task Result Comments 1) SYSTEM BEAR RIVE...
AI summary This document outlines the results of a generator insulation test conducted at the Bear River 6V-Hollow Bridge station. The test was performed on July 15, 2025, and highlights the importance of maintaining balanced windings to prevent circulating currents and voltage unbalance, which can lead to equipment failure.