Building# - Eqp#: 06V1-01-02 - TURBINE Task Result Comments TAILBOARD HAZARD ASSESSMENT Complete COMPLETE STEPS OF ISOLATION PROCEDURE DOWN TO ISSUE ISOLATION PER Complete COMPLETE & ISSUE ISOLATION PERMIT BLR-2023-013 ENSURE TO BARK HEAD...
AI summary The document outlines various tasks related to the maintenance and safety procedures for a turbine at Building# 06V1-01-02. Tasks include hazard assessments, isolation procedures, brake checks, and confirmation of field breaker operations, all of which have been completed or are under review.
Checklist: CA-GEN-INSUL-TEST Last Inspected By: AQ378 Description: Condition Assessment: Generator Insulation Test Last Inspected: 2025-07-15 WO#: 168698 Building# - Eqp#: 06V1-01-01 - HB1 GENERATOR Task Result Comments 29 (b) Yes, the win...
AI summary This document outlines the inspection and maintenance procedures for a generator insulation test conducted by AQ378 on July 15, 2025. It discusses the balance of windings, the installation of a heater, and the investigation into the root cause of a generator failure. No formal documentation exists for certain steps, and the root cause of the failure is still under investigation.