Matter: Nova Scotia Power Inc. - CI C0070486 – HYD Lower Great Brook Stoplog Replacement – $3,593,884
4 passages 3 documents

Procurement Practices across all matters →

N-2NSPI (NSEB) RIR 1 to 3 - Redacted 2 passages
PARTIALLY CONFIDENTIAL (Attachment Only) p. p. 46
PARTIALLY CONFIDENTIAL (Attachment Only) 1 Request IR-3: 2 3 (a) Does the cost of this work appear similar to other similar projects performed by the 4 utility? 5 6 (i) If yes, please provide the matter number and cost for comparison. 7 8...

AI summary The response to Request IR-3 discusses the unique aspects of a project involving environmental offsetting, archeology, and specific reservoir conditions, making direct comparisons to other projects difficult. The procurement process for various services was competitive, except for concrete pier refurbishment and dock installation, which were handled due to time constraints and necessity.

Quotation p. p. 85
Quotation Offeree Att: Rachel Vidal NOVA SCOTIA POWER Procurement Team HALIFAX, NS Canada Phone: Email: [email protected] Reference number 8138 R1 Project name Wooden Stoplogs (BC Fir, Hot, 14") Date of quotation May 9, 2025 As reque...

AI summary Nova Scotia Power Inc. (NSPI) has submitted a quotation for the procurement of Wooden Stoplogs (BC Fir, Hot, 14") as part of a project referenced by number 8138 R1. The quotation was submitted by Rachel Vidal from the NSPI Procurement Team.

100322NSEB (NSPI) IR 1 to 3 - PDF 1 passage
Request IR-3:
Request IR-3: - a) Does the cost of this work appear similar to other similar projects performed by the utility? - i. If yes, please provide the matter number and cost for comparison. - b) What was the process to procure Consulting and Con...

AI summary The document requests information on the cost similarity of a project to others performed by the utility and the procurement process for Consulting and Contracts services, including vendor quotations.

100323NSEB (NSPI) IR 1 to 3 - WORD 1 passage
Section 2
included the necessary refurbishment of four of six concrete piers that provide structural support for the stoplogs, as significant deterioration of the piers was observed during the project drawdown. Page 3 of the application notes, durin...

AI summary The text outlines questions raised regarding the structural condition and replacement timeline of stoplogs in Bays 1 and 6, the inspection report from 2024, the project timeline, cost breakdowns, and comparisons with similar projects. It also inquires about the procurement process for consulting and contracts services.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →