N-1-(iv)
Exhibits
08/14/2019
Appendix F - EE Model Outputs
N-1-(iv).xlsx · XLSX · 975.8 KB
The AI overview for this document is being prepared.
Filed in: M08929 — P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization
Filing event: CLOSING_EVIDENCE on 08/14/2019 · View digest →
Preview isn’t available for this file type — use Download original above to view it.