100928 Other documents 02/12/2026

Contingency Report #1 - Redacted

Download original
100928.pdf · PDF · 4.6 MB · 11 pages
AI overviewWhat this document contains

This document is a contingency report filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains detailed information on the Ruth Falls Main Dam Refurbishment project, including project timelines, task statuses, unbudgeted and contingency spending, delays due to unforeseen conditions and weather, and adjustments to the construction schedule.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M11927 — Nova Scotia Power Inc. - CI 50518 – HYD Ruth Falls Main Dam Refurbishment – $15,445,508 (ATO)

Filing event: APPLICATION on 02/12/2026

11 pages
100%