N-2(C)
Exhibits
01/29/2026
NSPI (Midgard) RIR 1 to 14 - Confidential
N-2(C).pdf · PDF · 133.8 KB · 1 page
No AI summary available — too little text in this document to summarize.
Filed in: M12550 — To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)
Filing event: RIR on 01/29/2026