N-2(C) Exhibits 01/29/2026

NSPI (Midgard) RIR 1 to 14 - Confidential

Download original
N-2(C).pdf · PDF · 133.8 KB · 1 page

No AI summary available — too little text in this document to summarize.

Filed in: M12550 — To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)

Filing event: RIR on 01/29/2026

1 page
100%