N-2-(i) Exhibits 01/29/2026

NSPI (Midgard) RIR 14 - Att 1-2 - Excels

Download original
N-2-(i).zip · ZIP · 29.8 KB

The AI overview for this document is being prepared.

Filed in: M12550 — To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)

Filing event: RIR on 01/29/2026

Preview isn’t available for this file type — use Download original above to view it.