N-2-(i)
Exhibits
01/29/2026
NSPI (Midgard) RIR 14 - Att 1-2 - Excels
N-2-(i).zip · ZIP · 29.8 KB
The AI overview for this document is being prepared.
Filed in: M12550 — To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)
Filing event: RIR on 01/29/2026
Preview isn’t available for this file type — use Download original above to view it.