100071 Other documents 11/24/2025

Email Notice to Participate - IG

Download original
100071.pdf · PDF · 302.5 KB · 3 pages
AI overviewWhat this document contains

This document is an exhibit containing an email notice related to a regulatory matter. It covers a cost reasonableness review of NS Power's RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the 2025 ACE Plan Decision (M12012), and includes information about participation in the matter by the Industrial Group.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12550 — To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)

Filing event: APPLICATION on 11/24/2025

3 pages
100%