100386 Other documents 12/19/2025

Board Letter re: Extension & new timeline

Download original
100386.pdf · PDF · 245.3 KB · 2 pages

No AI summary available — too little text in this document to summarize.

Filed in: M12550 — To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)

Filing event: APPLICATION on 12/19/2025

2 pages
100%