F-6 Exhibits 05/27/2026

FRANZ (NSEB) RIR-1

Download original
F-6.pdf · PDF · 134.0 KB · 1 page
AI overviewWhat this document contains

This document contains an intervenor response (RIR-1) from Celine Franz addressing her dispute with Nova Scotia Power, focusing on concerns about estimated consumption and billing period attribution in her appeal (M12773), and clarifying that she is not disputing meter defectiveness but is open to cooperating with a meter test if requested by the Board.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12773 — NSPI DRO Appeal - Billing Issues - Celine Franz

Filing event: RIR on 05/27/2026 · View digest →

1 page
100%