ecalled on two weeks' notice. Over the 2024/2025 winter period the unit was recalled to service four times by the NS Power System Operator to support firm customer load, generating a total of 128 GWh. In its 2024 and 2025 10-Year System Ou...
AI summary The document discusses the recall of the Lingan Unit 2 (LIN2) by NS Power to support winter firm load during the 2024/2025 and 2025/2026 winter periods. NS Power plans to keep LIN2 in cold reserve until new fast-acting generation resources are online. The IESO Nova Scotia also stated that LIN2 and Trenton 5 can only be retired once these new resources are in service and operating reliably.