Home›Energy Storage›M12959›Evidence
Topic/Matter Intersection

Topic:"Energy Storage" in M12959

Matter: Nova Scotia Power Inc. - CI C0082195 – LIN2 2025/26 Capacity Requirement - $4,392,251
3 passages 3 documents

Energy Storage across all matters →

103692Decision Letter 1 passage
Section 2
ecalled on two weeks' notice. Over the 2024/2025 winter period the unit was recalled to service four times by the NS Power System Operator to support firm customer load, generating a total of 128 GWh. In its 2024 and 2025 10-Year System Ou...

AI summary The document discusses the recall of the Lingan Unit 2 (LIN2) by NS Power to support winter firm load during the 2024/2025 and 2025/2026 winter periods. NS Power plans to keep LIN2 in cold reserve until new fast-acting generation resources are online. The IESO Nova Scotia also stated that LIN2 and Trenton 5 can only be retired once these new resources are in service and operating reliably.

103086NSEB (NSPI) IR 1 to 7 1 passage
Request IR-1:
Request IR-1: - a) What is the current rated capacity (in MW) of the LIN2 generating unit? - b) Please provide an estimate of the power generation from this unit for 2026 to 2030. - c) Please extend the table requested by Board staff in IR...

AI summary The document contains three requests (IR-1, IR-2, IR-3) to Nova Scotia Power Incorporated (NSPOWER) regarding the capacity of the LIN2 generating unit, reserve margins for 2026-2027, and firm import options from New Brunswick and Newfoundland. It seeks information on generation estimates, energy substitution, and capacity planning.

103692Decision Letter 1 passage
Section 2
ecalled on two weeks' notice. Over the 2024/2025 winter period the unit was recalled to service four times by the NS Power System Operator to support firm customer load, generating a total of 128 GWh. In its 2024 and 2025 10-Year System Ou...

AI summary LIN2 has been recalled multiple times during the 2024/2025 winter to support firm customer load, generating significant energy. NS Power states that LIN2 will remain in cold reserve until new fast-acting generation resources are online. The IESO Nova Scotia report (M12916) supports this, noting that LIN2 and Trenton 5 cannot be retired until reliable replacements are in service. NS Power also explains that battery energy storage and other resources are insufficient to replace LIN2's capacity due to increasing demand.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →