DESCRIPTION: This project was for the refurbishment of Lingan Unit 2 (LIN2) to safely operate and provide firm capacity required for system security through 2025 into winter 2026. Capital work was completed on critical plant equipment to e...
AI summary This document describes the refurbishment of Lingan Unit 2 (LIN2) to ensure safe operation through 2025 into winter 2026. Capital work was completed on various systems, including boilers, ash systems, electrical systems, and water systems. The Board directed NS Power to submit LIN2 CI projects as a single Winter Capacity Requirement application until otherwise directed.