Midgard (NSPI) IR 1 to 17 - WORD
100253.docx · DOCX · 519.3 KB
AI overviewWhat this document contains
This document is an IR response filed as part of a regulatory matter before the Nova Scotia Energy Board. It contains detailed requests for information and explanations related to the RTU Replacements Program – Phase 6, including scope of work, contingency determination, labor and equipment cost breakdowns, infrastructure complexity, risk assessments, and comparisons between original and updated capital cost estimates.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12550 — To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)
Filing event: APPLICATION on 12/10/2025
Preview isn’t available for this file type — use Download original above to view it.