CA (Midgard) IR 1 to 9 - Word
101124.docx · DOCX · 40.4 KB
AI overviewWhat this document contains
This document is an information request (IR) filed as part of a regulatory matter before the Nova Scotia Energy Board. It contains a series of questions and requests for clarification directed to Midgard Consulting regarding its analysis and recommendations on NS Power's RTU Replacements Program, including program execution strategy, labour hour estimates, contingency planning, risk documentation, and operational efficiency measures.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12550 — To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)
Filing event: APPLICATION on 03/04/2026
Preview isn’t available for this file type — use Download original above to view it.